AFTER HOURS EMERGENCY WATER/SEWER UTILITY CALLS, CALL (850) 233-5050

PRECAUTIONARY BOIL WATER NOTICE:  Affected area: 7205 Thomas Drive, Dunes of Panama Building "C".  Due to the replacement of a 3" value by the City Utilities Staff, the water supply experienced a temporary loss of water pressure on March 14, 2018.  If you live at this address, you may experience discolored water approximately 24 hours after your water has been restored.  As a precaution, we advise all water used for drinking, cooking, making ice, brushing teeth, or dish washing be boiled and a rolling boil of one minute is sufficient.  As an alternative, bottled water may be used. This notice will remain in effect until the problem has been corrected and a bacteriological survey shows that the water is safe to drink. The City will publicly issue a rescission lifting this “Precautionary Boil Water Notice” at that time.  If you have any questions, please contact PCB Utilities Department at (850) 233-5100 from 8AM-4PM, Monday -Friday, or after hours & weekends at (850) 233-5050.   

Panama City Beach Fire Service Assessment Information. Click HERE.
Fire Service Assessment Quick Search Engine. Click HERE.
The City has a new Facebook Page: City of Panama City Beach-Government.
We have listed several national, state and local regulations that you will find helpful for your rental property. Click HERE.
flag2 For Flag Warning System Click HERE.

Redevelopment Plan

Press Enter to show all options, press Tab go to next option

Front Beach Road Community Redevelopment Plan

The Front Beach Road CRA Redevelopment Plan provides a framework for redevelopment of infrastructures within the CRA for the next 20 years or longer. The Plan was adopted by the City Council in August 2001.

The Plan recommends the enhancement of approximately 19.8 miles of existing roadways within the Front Beach Road CRA. Cost elements include various streets widening to three and four lanes, enhancing roadway lighting, paving, striping, turn lanes, landscaped medians, new signage, hardscape, landscaping, sidewalks, drainage ponds and the undergrounding of all utilities. Streets within the Redevelopment Area currently identified for these type improvements include: Front Beach Road, North Thomas Drive, South Thomas Drive, Churchwell Drive, Richard Jackson Blvd, AIf Coleman Road, Clara Avenue, Nautilus Street, Hills Road, Powell Adams Road, South Arnold Road, Cobb Road, Hutchison Blvd, and Panama City Beach Parkway (US 98).

The Front Beach Road CRA Redevelopment Plan contains three long-term primary objectives:


  • 1. Pedestrian, Parking and Transportation Improvements

  • This objective includes an enhanced and interconnected network of right-of-way and other infrastructure projects that focuses on improving pedestrian movement,  overall  parking  needs along Front Beach Road, ingress/egress and evacuation routes along Front Beach Road and its major connectors, upgrading  stormwater  management  along  Front Beach  Road,  and undergrounding of utilities within the Redevelopment Area;


    2. Enhance Beach Access and Related Parking

    This objective includes the enhancement of existing beach access points and the creation of new access points where warranted, and the provision of parking areas to support these access points throughout the corridor;

    3. Plan Funding and Financing

    This objective includes the creation and maintenance of efficient, practical, equitable funding and financing to properly implement the Plan and its projects, utilizing tax increment revenues, non-ad valorem assessment revenue, bonds, other public instruments, grants, public/privet partnerships and other sources of funding.


    FBR Community Redevelopment Plan 


    Free viewers are required for some of the attached documents.
    They can be downloaded by clicking on the icons below.

    Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer